St Peter’s Brewery
Suffolk
Key Metrics
- System Size 222 kW
- Estimated Annual Energy Savings £50,000+
- CO2 Saving 99,608 (kg/yr) equivalent to planting 3,320 trees
- Payback Period Expected within 5 years
- Generating 147,000 kWhs of clean green electricity
- Energy Consumption Coverage 20% of the store’s annual energy needs
- Installation Time 4 weeks with minimal disruption to business operations
Project Details
At A Glance
St Peter’s Brewery, a historic brewery in Suffolk, sought a solar solution to reduce rising energy costs and support their sustainability goals. Known for their commitment to quality and tradition, they wanted an energy-saving system that would align with their production needs while preserving the character of their iconic site.
Challenge:
With high energy demands from brewing operations, St Peter’s Brewery needed a cost-effective solar PV solution that wouldn’t disrupt their day-to-day processes or impact the historic architecture of their facilities.
Solution:
We designed and installed a 222 kW solar (PV) system tailored to maximise the available roof space.
Key features included:

Tier 1 Solar Panels with A-Grade Cells for high efficiency

10-year warranty on the inverter

Installed by Part P NIC Certified Electricians, ensuring compliance and safety
Results:

Estimated Annual Savings
£50,000+ on energy bills

Co2 Savings
Equivalent to planting 3,320 trees

Payback Period
Expected within 5 years
View More of Our Solar Projects
- 252 kW system size
- £50,000+ annual saving
- 4 year payback period
- 440 kW system size
- £100,000+ annual saving
- 3 year payback period
- 328 kW system size
- £80,000+ annual saving
- 4 year payback period




























